Topology Selection of 100A High Efficiency Rectifier

 
1. Topology Classification


lDirect three-phase systems
  Single-stage
             ZVS Three-phase single-stage isolated rectifier
  Two-stage
             Unidirectional
                       Two-level  
                                      Three phase Buck
                       Multi-level  
                                     Vienna Rectifier
            Bidirectional
                       Two-level
                                      Six-switch rectifier
                       Multi-level
                                       Neutral point clamped converter


lCombination of single-phase systems
            Line-to-line 
                                voltage input (Δ-Rectifier )
            Line-to-neutral
                                voltage input (Y-Rectifier)
                With stable artificial neutral point
        With controllable neutral point

                
2. Select Topology
























































    3. Candidate



lSingle-Stage direct three-phase systems
          ZVS Three-phase single-stage isolated PWM/LLC rectifier
lTwo-Stage direct three-phase systems
          Vienna Rectifier + three level full bridge LLC
          Three phase Buck 
          Six-switch rectifier 
          Three level Neutral point clamped (NPC) converter 
lCombination of single phase systems
          Δ-Rectifier 
          Y-Rectifier with stable artificial neutral point 
    Y-Rectifier with controllable neutral point


Calculation of Inductance of chokes to be used for the paralleling of the Inverters

For the calculation of the Inductance of the chokes to be used to parallel the two inverters, we take into consideration the following two possibilities:

1. The corresponding parallel arms +ve & -ve are connected directly to one another (i.e. using busbars) as a result of which the inductance at the input is negligible.

2. The corresponding paralllel arms +ve & -ve are both connected to the output of the bridge rectifier as a result of which the inductance of these connections must be taken into consideration.

In the diagrams, for clarity, only one arm of each inverter has been shown and the possible connection of the DC busbars at the inut of each arm. It must be understood that for the entire system, there would be 3 such arms per inverter, giving therefore the 3-phase output.

Case 1

Direction connection of DC Inputs of paralleled Inverters



Here we have,

maximum value of Vdc = 850V

maximum delay between switching OFF of one TOP IGBT and switching ON of one BOT IGBT, Dt = 125 ns (i.e. the maximum possible time delay between the control pulse being received at the IGBTs and the IGBTs switching as a result)

say, maximum allowed DiSC = 10 A

Therefore,

Lac = 850 /(2 x 10)x 0.125 µH
       = 42.5 * 0.125 µH
       = 5.3125 µH
Lac = approx 5 µH

Case 2
Connection of Inputs of paralleled Inverters to Input bridge rectifier.


In this case, the additional inductance at the outputs of the bridge recifier will serve another purpose i.e. to smoothen the ripples in the output of the bridge circuit.


800kVA UPS Topology & Load Sharing Control Algorithm


 

Test result (1+1 multi-module system)


       CH4-System Voltage                    CH3-MOD#1scope_6

Nonload

THDu=0.39%/0.36%/0.35%  

Circulating current=4.44A


 scope_8


100kVA rectifier load (Acf=3)

THDu=1.62%/1.59%/1.56%

Current Unbalance Degree =0.72%




Current CH2-MOD#2 Current

scope_7


100% resistive load

THDu=0.45%/0.50%/0.37%

Current Unbalance Degree =1.53%

 scope_9


100% standard rectifier

THDu=1.34%/1.20%/1.31%

Current Unbalance Degree =1.12%